Ava Road Bridge Rehabilitation Update
BRANTFORD, ON – The City of Brantford is committed to ensuring the safety and longevity of our infrastructure, including the Ava Road Bridge, a vital connection over the Canadian National Railway (CNR) tracks linking Brant Avenue to Paris Road.
As part of the Ava Road Bridge Rehabilitation Project, temporary closures have been necessary. Since the week of May 27, 2024, the bridge has been closed to all traffic, along with vehicle and truck traffic closures on Ava Road/Brant Avenue between Parkside Drive and the western entrance to W. Ross Macdonald School for the Blind. Detour routes remain in place to assist residents navigating the area.
The City of Brantford is pleased to announce that Ava Road Bridge will reopen in time for the spring season, with an anticipated opening date of April 2025, weather permitting. This timeline reflects the extensive work required to accommodate the CN rail corridor, train frequencies and site-specific conditions encountered during construction. Until the project is complete and the area is deemed safe for motorists and pedestrians, the current closures will remain in place.
Additional details related to the Ava Road Bridge Rehabilitation Project, including information on the planned truck, vehicular, and pedestrian detour routes can be found on the City’s website at brantford.ca/AvaRoadBridge.
Thank you for your patience and understanding
We recognize that this closure impacts residents, businesses, and commuters, and we sincerely appreciate your patience and understanding. The City of Brantford remains dedicated to improving infrastructure for the safety and benefit of all residents. The Ava Road Bridge Rehabilitation Project is a significant step in building a better and more connected Brantford.
-30-
The City of Brantford Newsroom
Subscribe to News Alerts | City of Brantford Website | Privacy Policy
© City of Brantford, 58 Dalhousie Street, Brantford.